楼凤阁论坛(品茶)_一品阁品凤楼网站论坛_上海落花流水联盟论坛

上海金泰工程机械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

PRODUCT

BZ70

BZ70 Hydraulic walking pile frame is our heavy
equipment which is integrated by mechanical,
electrical and hydraulic systems. It is specially
made for SMW(Soil Mixing Wall) construction.
As a 70 tons grade pile frame, this type machine
integrated by new hydraulic system is developed
from our JB series Hydraulic walking pile
frame technology and construction experience
through improved quality and performance. This
equipment not only can be hung with SMW multishafts
drilling machines, but also can be used in
other foundation construction projects. So this high
performance model machine is a multi-functional
equipment to work in foundation projects, such as
bridges, harbors and diaphragm walls.

 

type

BZ70

Total leader length (m) 21-39
Adjustment range of leader angle(side) (°)  before and after (°) ±1.5
    left and right (°) ±1.5
  Earth auger
Hydraulic winch (earth auger)  /Single pull (max KN) 91.5
 Speed (m/min) 0-26
Hydraulic winch
(erection,drill stem)
 Single pull(max kn) 68
 Speed (m/min) 0-32
Vertical track  Speed (m/min) <2.7
 Step (mm) 800
  length (mm) 6900
 Width (mm) 1700
Cross track  Speed  (m/min) <4.5
 Step (mm) 3100
 length (mm) 9500
 Width (mm) 1200
Swing angle of platform(°) ±10
Lift Speed (m/min) <0.55
Lift Height (mm)( mm) 450
Average ground pressure (Mpa) ≤0.1
Pressure of hydraulic system (Mpa) 25/20
Control mode of hydraulic system electric control
weight (t) ≈130

 

主站蜘蛛池模板: 渑池县| 行唐县| 长海县| 松潘县| 金华市| 紫阳县| 寿阳县| 镇安县| 崇文区| 永寿县| 景宁| 建昌县| 丰镇市| 河源市| 江孜县| 合作市| 聊城市| 剑阁县| 宝山区| 武清区| 英吉沙县| 郯城县| 临朐县| 会同县| 兰考县| 吴堡县| 利辛县| 聊城市| 福泉市| 原阳县| 泸西县| 温泉县| 噶尔县| 翼城县| 石楼县| 玉树县| 闵行区| 视频| 巴林左旗| 饶平县| 肇东市|